FM90
- Field Control® Fresh Mist Central System Humidifier
Freshmist 90
Owners Manual
Installation
Installation
(on sheet metal plenums)
- Mark a level line on
selected plenum at bottom edge location for humidifier.
NOTE: Unit
must be installed level from left to right and front to back to maintain
proper float
control of water. See Fig. 10 for clearance required to open cover

Hold the humidifier housing against the plenum with the bottom edge on the
level
line.
Mark location of the (3) holes and large rectangular opening. Cut
opening with tin snips or saw and drill
(3) l/8" diameter holes (Fig. 9).

CAUTION: Do not drill into return
bends of air conditioning coil.
- Mount humidifier to hot air
plenum using the
three screws provided. Bend the two tabs 180" inward to seal humidifier
to plenum (Fig. 11).
- Position collar at selected location on the
cold air plenum. Mark
center opening and five holes. Cut out center
opening and drill five 1/8" holes.
- Attach collar and damper to
cold air plenum. Use five screws provided. Damper blade fits between
cold air plenum and collar
(Fig. 12).
- Connect the flexible tube with tube clamps to humidifier
and collar. Do not allow flexible tube to come within 3" of furnace
flue pipe. if tube is under stress (pulling), it may be necessary to
drill two holes in collar for
screws. This will prevent the clamp from slipping off (Fig. 13).
- It is best to install an overflow line. Local codes may require overflow
protection. The
overflow is in the bottom
of the reservoir. Use ½" inside diameter plastic or rubber tubing
to connect drain (tubing not furnished) (Fig. 14).

NOTE: Humidifier
must
be level for
drain to work
properly.
|
|
|